The original slate tiles have been put back on to the first two towers. We are very pleased with their appearance.

Slate picture

The steelwork is complete to the last pavilion with the insulated panels now being installed.  The ornate high level railings have been restored, these will be brought to site and re-fixed to the top of the tower in due course.

Insulated panels

The zinc to the stone dormers has been installed, the journey of its weathering can now commence.

Zinc dormer

 

Take a look at June’s time lapse footage.