We are nearly water tight to towers 1 and 2, with only the high level flat roofing to be done.

The slab has been cast for the Presidential Suite balcony. The view is fantastic.

Photo 1

The original railings are back onto tower 3 above the Presidential Suite.

We are still on track to finish for the end of August, weather permitting!