Works to strip the original roof coverings and structure has commenced, with all the original slates being sorted and stored in the basement for re-use.

The removal of the timber structure has all gone to plan with no unforeseen movement in the building.

The team is working very hard sorting out all of the details to this very complicated design.

IMG_20150120_150601  IMG_20150120_150545

A time lapse camera has been installed on the roof of the neighbouring Cathedral Court. Take a look at December’s time lapse footage.

video

Take a look at January’s time lapse footage.

video